钢桁梁顶推施工技术
引用本文:李会良.钢桁梁顶推施工技术[J].中国港湾建设,2009(2):57-59.
作者姓名:李会良
作者单位:中交一航局第四工程有限公司,天津,300456
摘    要:通过京津高速公路东段第五合同段北环铁路跨线桥工程,以78m钢桁梁顶推施工工艺为主线,重点介绍了钢桁梁顶推施工的技术准备:钢桁梁拼装平台搭设,临时墩的施工,滑道、导梁制作、安装以及顶推装置和位置的确定,顶推过程控制。施工结果表明,在不干扰既有铁路干线正常运营情况下,顶推施工技术速度快,安全可靠,并且一次成功。

关 键 词:铁路跨线  78  m钢桁架桥  顶推  施工技术  过程控制

Technique for Pushing and Installing Steel Truss Girders
LI Hui-liang.Technique for Pushing and Installing Steel Truss Girders[J].China Harbour Engineering,2009(2):57-59.
Authors:LI Hui-liang
Institution:No.4 Engineering Company Ltd.of CCCC First Harbor Engineering Company Ltd.;Tianjin 300456;China
Abstract:Based on the pushing and installing of 78 m steel truss girders during the construction of the flyover over railway lines on the Northern Ring of East Section of Beijing-Tianjin Expressway under Contract No.5,the paper focuses on the tech-nical preparations for the installation of steel truss girders,such as erection of a platform for assembling of steel truss girders,construction of temporary piers,fabrication and erection of the slipway and nose-girder,determination of the pushing gear and its location,an...
Keywords:crossing over railway line  78 m steel truss bridge  pushing for installation  construction technique  process control  