首页 | 本学科首页   官方微博 | 高级检索  
     检索      

云南大丽铁路三元隧道开挖与支护施工技术
引用本文:刘伟.云南大丽铁路三元隧道开挖与支护施工技术[J].铁路工程造价管理,2009,24(6):40-44.
作者姓名:刘伟
作者单位:中铁四局集团,二公司,云南,丽江,674100
摘    要:在铁路隧道施工过程中,隧道的开挖与支护是保证施工质量及安全控制的关键环节。此文初步探讨了Ⅴ级、Ⅳ级、Ⅲ级围岩隧道开挖与支护的施工技术,对长短台阶法、全断面法、CRD法及CD法4种施工方式做了简要介绍。

关 键 词:隧道  开挖  支护  施工技术

Excavating and supporting construction technologies of Sanyuan Tunnel of Dali Railway in Yunnan
Liu Wei.Excavating and supporting construction technologies of Sanyuan Tunnel of Dali Railway in Yunnan[J].Railway Engineering Cost Management,2009,24(6):40-44.
Authors:Liu Wei
Abstract:In the process of railway tunnel construction, excavating and supporting technology is a critical link of construction quality and security control. This paper explores excavating and supporting construction technologies of railway tunnels in Ⅴ - class surrounding rock, Ⅳ - class surrounding rock, Ⅲ - class surrounding rock, including long& short step based method, entire section method, CRD - method and CD - method.
Keywords:tunnel  excavating  supporting  construction technology
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号