敏感环境条件下地铁停车场桥基施工对下伏高铁隧道群的扰动效应研究
引用本文:戴维,刘洋,陈玉发,傅鹤林,朱卫绵,孙广臣.敏感环境条件下地铁停车场桥基施工对下伏高铁隧道群的扰动效应研究[J].公路工程,2020(1):12-17,104.
作者姓名:戴维  刘洋  陈玉发  傅鹤林  朱卫绵  孙广臣
作者单位:中铁五局集团建筑工程有限责任公司;中南大学土木工程学院;中南林业科技大学土木工程学院
基金项目:国家自然科学基金项目(51978668;51408617)
摘    要:深圳地铁6号线民乐停车场工程上跨3条高速铁路隧道,具有结构复杂、环境敏感、地质复杂、施工难度大、工期紧张及施工风险高的特点。为了准确分析和合理评估复杂地质环境条件下大直径桩基开挖对运营高铁隧道安全运营的影响,运用三维数值模拟软件分析了该地铁停车场桥基施工对下部侧穿高铁填土隧道的扰动效应。数值计算结果表明,在多种开挖方案和技术条件下,大直径桩基的开挖成孔不会造成紧邻地铁停车场下方各运营高铁隧道的变形和受力状态的明显改变,整体处于施工安全范围内,表明桩基施工不会危及高铁隧道的结构安全和列车的行车安全。结论对该工程建设及高铁隧道安全运营具有一定的指导意义,可供类似地质条件下相互毗邻、复杂交接工程的设计与施工参考。

关 键 词:地铁停车场  填土区  桩基施工  高铁隧道  扰动效应

Disturbance Effect of Pile Foundation Construction in Metro Parking Yard on Subjacent High-speed Rail Tunnel Groups under Sensitive Environment
DAI Wei,LIU Yang,CHEN Yufa,FU Helin,ZHU Weimian,SUN Guangchen.Disturbance Effect of Pile Foundation Construction in Metro Parking Yard on Subjacent High-speed Rail Tunnel Groups under Sensitive Environment[J].Highway Engineering,2020(1):12-17,104.
Authors:DAI Wei  LIU Yang  CHEN Yufa  FU Helin  ZHU Weimian  SUN Guangchen
Institution:(Construction Engineering Company of China Railway No.5 Engineering Group Co.,Ltd,Guiyang,Guizhou 550081,China;School of Civil Engineering,Central South University,Changsha,Hunan 410075,China;College of Civil Engineering,Central South University of Forestry and Technology,Changsha,Hunan 410004,China)
Abstract:The Minle parking yard project of Shenzhen Metro Line 6 spans three high-speed railway tunnels,which are characterized by complex structure,sensitive environment,complex geology,difficult construction,tight construction period and high construction risk.In order to accurately analyze and reasonably evaluate the impact of large diameter pile foundation excavation on the safe operation of high-speed railway tunnel under complex geological environment conditions,the disturbance effect of bridge foundation construction is analyzed by using three-dimensional numerical simulation software on these three lower side-crossing high-speed railway filled tunnels.The numerical results show that,under various excavation schemes and technical conditions,the excavation of large diameter pile foundation will not cause obvious changes in the deformation and stress state of the high-speed railway tunnels operating under the adjacent Metro parking yard,which is within the scope of construction safety,indicating that the construction of pile foundation is feasible.Workers will not endanger the structural safety of high-speed railway tunnels and the safety of trains.The conclusions of this paper have certain guiding significance for this construction of practical project and the safe operation of high-speed railway tunnels,and can be used as reference for the design and construction of adjacent and complex handover projects under similar geological conditions.
Keywords:metro parking yard  filled land  pile foundation construction  high-speed rail tunnel  disturbance effect