首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Operations scheduling for rail mounted gantry cranes in a container terminal yard
Authors:Zhan Bian  Na Li  Xiang-jun Li  Zhi-hong Jin
Institution:1. Transport Management College, Dalian Maritime University, Dalian, 116026, Liaoning, China
2. Information Engineering College, Dalian Ocean University, Dalian, 116023, Liaoning, China
Abstract:Arranging the retrieving sequence and making the operational plans for gantry cranes to enhance port efficiency have become vital issues for the container terminals. In this paper, the problem of retrieving containers from a yard in a given sequence is discussed as an important part of the ship-loading process. This problem is divided into three categories according to its optimization complexity, i.e., the retrieval problem of a crane with a single spreader (ACSS), the retrieval problem of a crane with multiple spreaders (ACMS), and the retrieval problem of multiple cranes with a single spreader (MCSS). Firstly, heuristic algorithms are proposed to develop a retrieving sequence for ACSS to reduce the operational time. Then, optimizing the assignment to multiple spreaders is conducted by exchanging the movements of the obtained retrieving sequence. Finally, the movements are further assigned to two cranes and integrated with the MCSS retrieval problem mentioned above. The numerical experiments show the effectiveness and practicability of the heuristic algorithms.
Keywords:
本文献已被 CNKI 维普 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号