首页 | 本学科首页   官方微博 | 高级检索  
     

既有线站改过渡信号方案研究
引用本文:王玮. 既有线站改过渡信号方案研究[J]. 铁道通信信号, 2012, 48(3): 24-26
作者姓名:王玮
作者单位:中铁第一勘察设计院集团通号处,西安,710043
摘    要:结合南疆吐库二线站改过渡工程,总结了几种既有线车站插铺道岔纳入既有联锁过渡工程的设计原则,电路处理方法等。对如何规范站改过渡信号工程设计,确保既有线联锁车站安全具有一定的借鉴意义。

关 键 词:站改过渡  道岔表示  联锁

Study of Transitional Signal Scheme for the Renovation of Existing Railway Station
Wang Wei. Study of Transitional Signal Scheme for the Renovation of Existing Railway Station[J]. Railway Signalling & Communication, 2012, 48(3): 24-26
Authors:Wang Wei
Abstract:In combination with the station renovation project of Southern Xinjiang railway,this paper summarized a few kinds of design principles for laying switch of existing line station belonging to the existing interlocking transition project,and managing methods of electric circuit.It does a useful effort for how to standard the transit signal reworking design,and ensures the safety of existing line interlocking station.
Keywords:Transition of station renovation  Switch indication  Interlocking
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号