首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大连地铁3号线增设车站方案研究
引用本文:任少伟.大连地铁3号线增设车站方案研究[J].现代城市轨道交通,2020(1):73-77.
作者姓名:任少伟
作者单位:中国铁路设计集团有限公司
摘    要:基于大连地铁3号线车辆段物业开发及线路大修需求,对3号线既有线的配线形式、出入线发车效率、线路条件等方面进行深入研究,综合考虑近远期工程情况,推荐在大连湾站和金马站区间(以下简称"大金区间")初期增设侧式站台方案;后期根据出入线改造情况,可进行一岛一侧改造方案。

关 键 词:地铁  既有线  车辆段  增设车站  侧式站台

Study on scheme of additional stations to Dalian metro line 3
Ren Shaowei.Study on scheme of additional stations to Dalian metro line 3[J].Modern Urban Transit,2020(1):73-77.
Authors:Ren Shaowei
Abstract:Based on the in-depth study of the distribution layout, departure and arrival efficiency and track conditions of the existing Dalian metro line 3, and integration of shortterm and long-term projects, this paper recommends to add side platform at the initial stage of the section between Dalian Bay station and Jinma station(hereinafter referred to as Dajin Section). In the later stage, based on the reconstruction of the arrival and departure tracks, one side of the island is to be reconstructed as the real property of Bay depot.
Keywords:subway  existing line  vehicle depot  additional station  side platform
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号