海口港二期工程浮船坞拖运沉箱相关计算 |
| |
引用本文: | 庄宏胜,徐健.海口港二期工程浮船坞拖运沉箱相关计算[J].华南港工,2007(3). |
| |
作者姓名: | 庄宏胜 徐健 |
| |
作者单位: | 中交四航局第三工程有限公司 广东湛江524005 |
| |
摘 要: | 本文介绍浮船坞拖运沉箱的阻力估算及拖轮与拖缆选用计算,并在海口港二期工程沉箱拖运中验证该计算结果。
|
关 键 词: | 浮船坞 拖运沉箱 阻力估算 |
Related Calculation of Hauled Caisson for the Floating Dock of Haikou Port Phase2 |
| |
Authors: | ZHUANG Hong-sheng XU Jian |
| |
Abstract: | This paper presents the friction estimation and choice of tug and hauling rope for caisson hauling. The calculation results are verified in the caisson hauling for Haikou Port Phase2. |
| |
Keywords: | floating dock hauling caisson friction estimation |
本文献已被 CNKI 等数据库收录! |