马家楼站车站主体围护结构锚索设计与施工
引用本文:熊竺.马家楼站车站主体围护结构锚索设计与施工[J].都市快轨交通,2008,21(4):64--67.
作者姓名:熊竺
作者单位:中铁第四勘察设计院集团有限公司,武汉,430063
基金项目:北京地铁4号线工程建设
摘    要:利用设计软件FRWS4.0,对北京地铁4号线马家楼站主体基坑围护结构进行计算,针对不同桩型分别得到对应的锚索拉力值;试验数据证明,预应力锚索是可靠的,在施工过程中进行锚索张拉试验,表明锚索的施工可以满足设计要求,主体结构的施工工期大大缩短,工程收到了预期的效果。

关 键 词:基坑  桩型  锚索拉力值  锚索张拉试验
修稿时间:2013/12/6 0:00:00

Anchor Cable Design and Installation for the Excavation Pit Support of Majialou Station
Xiong Zhu.Anchor Cable Design and Installation for the Excavation Pit Support of Majialou Station[J].Urban Rapid Rail Transit,2008,21(4):64--67.
Authors:Xiong Zhu
Abstract:Software FRWS 4.0 was used to calculate the excavation pit support of Majialou Station on Beijing subway Line 4.Tensile forces in anchor cables for different types of piles were obtained respectively.During the process of construction,pulling out test of the anchor cables was performed and results of the test indicated that the installed anchor cables were reliable and could meet design requirements.
Keywords:excavation pit  pile type  tensile forces in anchor cables  pulling test of anchor cables