首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅析新建铁路曲线区段接触悬挂的计算条件
引用本文:廖军华.浅析新建铁路曲线区段接触悬挂的计算条件[J].铁道建筑技术,2009(3).
作者姓名:廖军华
作者单位:中铁建电气化局集团有限公司,北京,100043
摘    要:通过比较不同速度条件下的外轨超高对接触网腕臂预配长度、吊弦长度以及接触线拉出值的影响,提出了在新建铁路或增建二线铁路工程中,当线路开通速度小于设计速度时的曲线区段接触悬挂的计算和预留条件。

关 键 词:新建铁路  曲线区段  接触悬挂  计算条件

Discussion on the Computing Conditions of the Catenary Suspension in the Railway Curved Section
LIAO Junhua.Discussion on the Computing Conditions of the Catenary Suspension in the Railway Curved Section[J].Railway Construction Technology,2009(3).
Authors:LIAO Junhua
Institution:Liao Junhua(China Railway Construction Electrification Group Co.Ltd.; Beijing 100043; China);
Abstract:Through the comparison of the super-high outer rails influence on the pre-assigned length of the contact net bracket,the length of the dropper,and the pulling value of the contact lines under different speeds,this paper puts forward the computing and reserving conditions for the catenary suspension in the curved section when the line s opening speed is less than the designed speed,in the engineering of new railway or second-line railway.
Keywords:newly-built railway  curved section  catenary suspension  computing condition
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号