首页 | 本学科首页   官方微博 | 高级检索  
     检索      

斜拉桥悬臂施工阶段剪力滞效应分析
引用本文:钟升明,杜柏松.斜拉桥悬臂施工阶段剪力滞效应分析[J].交通科技与经济,2013,15(3):19-21.
作者姓名:钟升明  杜柏松
作者单位:重庆交通大学土木建筑学院,重庆,400074
摘    要:在介绍二三杆比拟法分析剪力滞效应思路的基础上,将三杆比拟法应用于单索面混凝土箱形斜拉桥悬臂施工阶段剪力滞系数的实际工程计算,并与实测数据相比较指出三杆比拟法在桥梁施工阶段的应用可以满足工程要求。

关 键 词:斜拉桥  施工阶段  剪力滞效应  三杆比拟法

Analysis of shear lag effect during the cable-stayed bridge constuction
ZHONG Sheng-ming , DU Bai-song.Analysis of shear lag effect during the cable-stayed bridge constuction[J].Technology & Economy in Areas of Communications,2013,15(3):19-21.
Authors:ZHONG Sheng-ming  DU Bai-song
Institution:(School of Civil Engineering and Architecture, Chongqing Jiaotong University, Chongqing 400074, China)
Abstract:In order to study the shear lag effect in practical engineering application, the three-bar simulation method is used to calculate the shear lag coefficient of a single cable plane concrete box girder cable-stayed bridge during construction stage, which is based on the idea of the three bar simulation method, and then the calculations are compared with the measured data to finger out that the three bar simulation method in construction stage can meet the engineering requirements.
Keywords:cable-stayed bridge  construction stage  shear lag effect  three bar simulation method
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号