首页 | 本学科首页   官方微博 | 高级检索  
     

斜拉桥无应力状态控制法闭合条件
引用本文:廖原,范中林. 斜拉桥无应力状态控制法闭合条件[J]. 水运科技信息, 2014, 0(4): 35-38
作者姓名:廖原  范中林
作者单位:湖北省交通规划设计院,武汉430051
摘    要:运用无应力状态控制法基本原理对大跨度斜拉桥施工控制计算中影响其计算结果闭合的因素进行分析,重点讨论了合龙、支座安装、临时支撑安装和拆除引起的状态不闭合,以及非线性和混凝土收缩徐变影响引起的计算不闭合。并在此基础上总结出斜拉桥无应力控制法闭合条件,以及实现闭合的计算流程。

关 键 词:无应力状态控制法  闭合条件  斜拉桥

Study on Closed Condition of Stress-free Status Control Method for Cable-stayed Bridge
LiaoYuan,Fan Zhonglin. Study on Closed Condition of Stress-free Status Control Method for Cable-stayed Bridge[J]. Transportation Science & Technology, 2014, 0(4): 35-38
Authors:LiaoYuan  Fan Zhonglin
Affiliation:(Hubei Provincial Communication Planning and Design Institute, Wuhan 430051, China)
Abstract:The influence factors on closed conditions of construction control in large span cable-stayed bridge is analyzed in this paper. The unclosed conditions factors in status are caused by bridge closed, bearing installation, temporary support installation and removal. The unclosed conditions factors in calculation are caused by nonlinearity and concrete shrinkage and creep. On this basis, the calculation process of closing conditions by free stress status control method for cable stayed bridge is summed up.
Keywords:stress-free status control method  closed condition  cable-stayed bridge
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号