连续箱梁跨河施工贝雷支架法现浇施工技术
引用本文:王子龙.连续箱梁跨河施工贝雷支架法现浇施工技术[J].中国水运,2007,7(5):116-117.
作者姓名:王子龙
作者单位:中铁十四局集团第四工程有限公司
摘    要:本文主要研究了跨河施工贝雷支架施工技术方案,同时根据施工前在组合恒、活载作用下的现场预压试验支架变形数据,研究了施工支架的计算、分析方法。

关 键 词:现浇连续梁  贝雷支架  检算  施工技术
文章编号:1006-7973(2007)05-0116-02
修稿时间:2007年3月7日

The continual box girder span river constructs the Behre support law cast-in-place construction technology
Wang Zilong.The continual box girder span river constructs the Behre support law cast-in-place construction technology[J].China Water Transport,2007,7(5):116-117.
Authors:Wang Zilong
Institution:Wang Zilong
Abstract:This article mainly studied the cross river to construct the Behre support construction technology plan,simultaneously acted according to before the construction in to combine permanently,under the live load function scene precompression experiment support distortion data,has studied the construction support computation,the analysis method.
Keywords:Cast-in-place continuously Liang Behre support Examines calculated Construction technology