首页 | 本学科首页   官方微博 | 高级检索  
     检索      

宁和城际矿山法隧道下穿国铁隧道影响分析
引用本文:彭红霞,程云妍,王怀东.宁和城际矿山法隧道下穿国铁隧道影响分析[J].隧道建设,2014,34(12):1137-1142.
作者姓名:彭红霞  程云妍  王怀东
作者单位:(1.南京地铁集团有限公司, 江苏 南京 210008; 2.中铁隧道勘测设计院有限公司, 天津 300133 )
摘    要:为验证矿山法隧道设计的合理性和下穿货运铁路隧道的安全性,采用数值模拟方法,对宁和城际矿山法区间下穿宁芜货运铁路隧道的影响进行了研究分析。结果表明,区间隧道施工完成后,宁芜货运铁路隧道的最大沉降为6.7 mm,最大水平位移为1.2mm,引起的最大附加弯矩为32 k N·m,变形值满足货运铁路的运营要求,内力值也在结构的设计范围内。说明定向管棚+超前小导管的地层加固措施是可行的,矿山法隧道下穿铁路的设计是合理的,可为类似工程提供参考。

关 键 词:铁路隧道  地铁区间  矿山法  数值分析
收稿时间:2014-08-11

Analysis on Influence of Construction of Mining Tunnel on Nanjing Hexian Inter city Railway Crossing Underneath Existing Freight Railway Tunnel
PENG Hongxia,CHENG Yunyan,WANG Huaidong.Analysis on Influence of Construction of Mining Tunnel on Nanjing Hexian Inter city Railway Crossing Underneath Existing Freight Railway Tunnel[J].Tunnel Construction,2014,34(12):1137-1142.
Authors:PENG Hongxia  CHENG Yunyan  WANG Huaidong
Institution:(1. Nanjing Metro Group Co., Ltd., Nanjing 210008, Jiangsu, China;2. China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China)
Abstract:The influence of the construction of a mining tunnel on Nanjing Hexian inter city railway crossing underneath an existing Nanjing Wuhu freight railway tunnel is analyzed by means of numerical simulation, so as to verify the rationality of the design of the mining tunnel and the safety of the existing freight railway tunnel. The results show that, after the construction of the mining tunnel, the maximum settlement of the existing railway tunnel is 6.7 mm, the maximum horizontal displacement of the existing railway tunnel is 1.2 mm and the maximum additional bending moment induced is 32 kN?m. The deformation values can meet the operation requirements of the existing freight railway and the internal forces are within the design scope of the structures. It is verified that the ground reinforcement measures including “directional pipe roof + forepoling” taken are reliable, and the design of the mining tunnel crossing underneath the existing railway tunnel is rational. The paper can provide reference for similar projects in the future.
Keywords:existing railway tunnel  Metro tunnel  mining method  numerical analysis
本文献已被 CNKI 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号