首页 | 本学科首页   官方微博 | 高级检索  
     检索      

“短孔卸压降振法”对周边孔爆破减振效果的研究
引用本文:李梓源,王海亮.“短孔卸压降振法”对周边孔爆破减振效果的研究[J].隧道建设,2017,37(3):315-320.
作者姓名:李梓源  王海亮
作者单位:(山东科技大学矿山灾害预防控制教育部重点实验室, 山东 青岛 266510)
基金项目:国家自然科学基金项目(10672091); 青岛巿建委科技项目资助(JK2013-4)
摘    要:为了解"短孔卸压降振法"对周边孔最大振速的影响程度,利用多自由面削减能量的原理,首先采用ANSYS-DYNA数值模拟软件对设置"卸压短孔"前后的断面模型进行计算分析,其次结合现场对设置"卸压短孔"前后的隧道断面爆破试验,提取爆破后的振速图进行对比论证,从而得出设置"卸压短孔"前的断面爆破振速大于设置后的断面爆破振速的结论。结果表明:1)使用"短孔卸压降振法"后,断面周边孔振动速度有所降低;2)采用"短孔卸压降振法"进行控制爆破后,隧道开挖轮廓线成型平整,超欠挖现象显著减少。

关 键 词:地铁隧道  周边孔爆破  短孔卸压降振法  数值模拟  试验\振动速度
收稿时间:2016-07-28

Study of Influence of Short hole Pressure Relieving and Vibration Reduction Method on Blasting Vibration Reduction Effect of Peripheral Holes
LI Ziyuan,WANG Hailiang.Study of Influence of Short hole Pressure Relieving and Vibration Reduction Method on Blasting Vibration Reduction Effect of Peripheral Holes[J].Tunnel Construction,2017,37(3):315-320.
Authors:LI Ziyuan  WANG Hailiang
Institution:(Key Laboratory of Mine Disaster Prevention and Control, Shandong University of  Science & Technology, Qingdao 266510, Shandong, China)
Abstract:In order to study the influence of short hole pressure relieving and vibration reduction method on the blasting vibration reduction effect of peripheral holes, the tunnel cross section model before and after setting pressure reducing short holes are calculated and analyzed by ANSYS DYNA numerical simulation software; the blasting tests are carried out on tunnel cross section before and after setting pressure reducing short holes; and then comparison is made on vibration velocity diagrams collected before and after setting of pressure reducing short holes. The results show that: 1) The blasting vibration velocity of peripheral holes after using short hole pressure relieving and vibration reduction method is smaller than that before using short hole pressure relieving and vibration reduction method. 2) The tunnel excavation contour line goes smooth and shaped; and the overbreak and underbreak times have been reduced by using short hole pressure relieving and vibration reduction method.
Keywords:Metro tunnel  blasting of peripheral holes  short hole pressure relieving and vibration reduction method  numerical simulation  test  vibration velocity
本文献已被 CNKI 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号