下行式移动模架现浇32m客运专线双线箱梁施工技术
引用本文:董志彬.下行式移动模架现浇32m客运专线双线箱梁施工技术[J].铁道建筑技术,2009(7):126-128.
作者姓名:董志彬
作者单位:中铁二十二局集团第四工程有限公司,河北高碑店,074000
摘    要:结合石太客运专线采用移动模架现浇32m双线整孔简支箱梁的工程实践,介绍了下行式移动模架的设计、拼装、预压、混凝土浇筑施工、预应力张拉、过孔等施工技术。

关 键 词:移动模架  客运专线  施工技术

Construction Technique for Double Line Box Girder of Moving Die Carrier Cast-in-place 32 m Passenger Dedicated Line
Dong Zhibin.Construction Technique for Double Line Box Girder of Moving Die Carrier Cast-in-place 32 m Passenger Dedicated Line[J].Railway Construction Technology,2009(7):126-128.
Authors:Dong Zhibin
Institution:Dong Zhibin ( China Railway 22th Bureau Group Co. Ltd. , Gaobeidian 074000, China)
Abstract:Combining the construction practice of Shijiazhuang-Taiyuan passenger dedicated line, and adopting the method of moving die cartier cast-in-place 32 m double-line simply-supported box Orders, the author introduces the design of mov-ing die cartier and its installation, prepress, concrete pouting construction, prestress tensioning and via holes.
Keywords:moving die carrier  passenger dedicated fine  construction technique