首页 | 本学科首页   官方微博 | 高级检索  
     检索      

麦积山特长隧道施工配电、通风技术
引用本文:孙凤玲.麦积山特长隧道施工配电、通风技术[J].铁道建筑技术,2010(5):45-48.
作者姓名:孙凤玲
作者单位:中铁二十局集团第五工程有限公司,昆明,650200
摘    要:随着我国公路和铁路建设的不断发展,长大隧道越来越多,施工难度也越来越大。作为隧道施工配电、通风系统,应根据隧道施工的难度和隧道实际情况采取合理的布设方案,为顺利施工创造良好环境。结合麦积山隧道施工实例,详细介绍了施工过程中通风和配电方面的措施。

关 键 词:特长隧道  施工配电  隧道通风

Power Distribution and Ventilation Technology in Extra-long Tunnel Construction of Maiji Mount
Sun Fengling.Power Distribution and Ventilation Technology in Extra-long Tunnel Construction of Maiji Mount[J].Railway Construction Technology,2010(5):45-48.
Authors:Sun Fengling
Institution:Sun Fengling (China Railway 20th Bureau Group Co. Ltd. , Kunming 650200, China)
Abstract:With constant development of highway and railway construction in our country, the number of extra-long tunnels is increasing, together with the increase of construction difficulty. The power distribution and ventilation system in tunnel construction should adopt reasonable layout scheme according to tunnel construction difficulty and real tunnel conditions, so as to create a good environment for smooth construction. In light of tunnel construction practice in Maiji Mount. , this paper introduces in detail the ventilation and power distribution measures in construction.
Keywords:extra-long tunnel  power distribution  tunnel ventilation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号