首页 | 本学科首页   官方微博 | 高级检索  
     检索      

千岛湖大桥工程变更与费用审核之探讨
引用本文:徐建达,温向阳,唐钰向.千岛湖大桥工程变更与费用审核之探讨[J].浙江交通职业技术学院学报,2007,8(2):61-65.
作者姓名:徐建达  温向阳  唐钰向
作者单位:1. 杭州市交通工程造价管理站,浙江,杭州,310014
2. 淳安县千岛湖大桥建设指挥部,浙江,淳安,317000
摘    要:通过对千岛湖大桥变更与费用审核情况回顾,提出变更与费用审核的有关操作程序和方法。

关 键 词:工程  变更  费用  审核
文章编号:1671-234X(2007)02-0061-05
修稿时间:2006-12-30

Discussion on the Engineering Change and Expenses Verification of Qiandaohu Bridge
XU Jian-da,WEN Xiang-yang,TANG Yu-xiang.Discussion on the Engineering Change and Expenses Verification of Qiandaohu Bridge[J].Journal of Zhejiang Vocational and Technical Institute of Transportation,2007,8(2):61-65.
Authors:XU Jian-da  WEN Xiang-yang  TANG Yu-xiang
Institution:1. Hangzhou Station of Transportation Engineering Cost Administration, Hangzhou 310014; 2. China; Chunan Qianclaohu Bridge headquarters, Chunan317000, China
Abstract:Based on the analysis of construction status changing in Qiandaohu bridge project due to optimization necessary and escalating expense,the paper illustrates both engineering change and expenses verification procedures in detail which have been handled in this project.And it also points out the method,process and consideration which could be used in relevant situation.
Keywords:Engineering Change  Verification  Expenses  Qiandaohu Bridge
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号