首页 | 本学科首页   官方微博 | 高级检索  
     检索      

长春远达大街跨越长春东站立交桥钢箱梁架设施工技术
引用本文:何映春.长春远达大街跨越长春东站立交桥钢箱梁架设施工技术[J].铁道建筑技术,2014(6):24-28.
作者姓名:何映春
作者单位:中铁第五勘察设计院集团有限公司,北京102600
摘    要:结合长春市东纵远达大街跨越长春东站立交桥钢箱梁架设安装工程,着重阐述了在城市复杂条件下桥梁架设施工方法,并介绍了方案选择,顶推台座、牵引系统、滑动和纠偏系统、导梁等的设计和布置方法,可为今后同类型桥梁的设计和施工提供借鉴。

关 键 词:连续钢箱梁  桥梁架设  钢梁划分

Construction Technology on Steel Box Girder Erection of Changchun Yuanda Street Crossing Overpass Bridge of Changchun East Station
He Yingchun.Construction Technology on Steel Box Girder Erection of Changchun Yuanda Street Crossing Overpass Bridge of Changchun East Station[J].Railway Construction Technology,2014(6):24-28.
Authors:He Yingchun
Institution:He Yingchun (China Railway Fifth Survey and Design Institute Group Co. Ltd. , Beijing 102600, China)
Abstract:Combination of overpass bridge steel box girder erection and installation engineering in Changchun East Longitudinal Yuanda Street crossing the Changchun East station, this paper emphatically elaborated bridge erection method under the complex conditions in the city, and introduced the scheme selection, pushing pedestal, traction system, design and arrangement of sliding and correction system, guiding beam. This can provide references for the design and construction of the same type bridge in the future.
Keywords:continuous steel box girder  bridge erection  steel girder division
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号