首页 | 本学科首页   官方微博 | 高级检索  
     检索      

凌云大桥横梁吊装方案比选及稳定性评估
引用本文:陈雪峰.凌云大桥横梁吊装方案比选及稳定性评估[J].现代交通技术,2012,9(1):40-43.
作者姓名:陈雪峰
作者单位:江苏省交通工程集团有限公司苏州分公司,江苏苏州,215131
摘    要:当涂凌云大桥跨径组合为29.4m+80.5m+93m+80.5m+29.4m,中间3跨为中承式钢管混凝土拱桥结构,两端25.55m为上承式钢筋混凝土拱桥(半拱),文章对横梁吊装顺序进行比选,并对所选方案进行静力计算和稳定性评估,验证了所选方案的可行性。

关 键 词:系杆拱桥    吊装顺序    静力计算    稳定性评估

Scheme Comparison of Crossbeam Hoisting and Stability Analysis for Lingyun Bridge
Chen Xuefeng.Scheme Comparison of Crossbeam Hoisting and Stability Analysis for Lingyun Bridge[J].Modern Transportation Technology,2012,9(1):40-43.
Authors:Chen Xuefeng
Institution:Chen Xuefeng (Suzhou Branch of Jiangsu Transportation Engineering Group Co., Ltd, Suzhou 215131, China)
Abstract:The designed span length of Lingyun bridge in Dangtu is 29.4 m+80.5 m+93 m+80.5 m+29.4m,the middle three spans are concrete-filled steel tubular tied-arch bridge and the two ends are reinforced concrete deck arch bridge (half arch). This paper introduced the static calculation and stability analysis of different hoisting sequence of crossbeam and verified the feasibility of the selected proposal.
Keywords:tied-arch bridge  hoisting sequence  static calculation  stability analysis
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号