首页 | 本学科首页   官方微博 | 高级检索  
     检索      

铁路特大桥深基坑施工挖孔桩板墙结构防护体系的设计与计算
引用本文:张晓波.铁路特大桥深基坑施工挖孔桩板墙结构防护体系的设计与计算[J].铁道建筑技术,2009(8):23-27.
作者姓名:张晓波
作者单位:中铁十二局集团第三工程有限公司,太原,030024
摘    要:洪凝河特大桥14号墩基坑开挖深,施工难度大,边坡稳定性差,为防止因基坑开挖给222省道、地下光缆等造成不利影响,应用挖孔桩板墙结构防护体系进行基坑施工,取得了理想效果。结合工程实践,介绍挖孔桩板墙结构防护体系的设计和计算。

关 键 词:铁路特大桥  挖孔桩板墙结构  防护体系  设计与计算

Design and Caieulation of Dug Pile Wall Protection System of Deep Foundation Construction for Railway Bridge
Zhang Xiaobo.Design and Caieulation of Dug Pile Wall Protection System of Deep Foundation Construction for Railway Bridge[J].Railway Construction Technology,2009(8):23-27.
Authors:Zhang Xiaobo
Institution:Zhang Xiaobo ( China Railway 12th Bureau Group Co. Ltd. , Taiyuan 030024, China)
Abstract:The construction of the No. 14 pier foundation of Hongning River super large bridge has great difficulty because of its great depth and instable slope. The dug pile wall structure was adopted in the foundation construction to protect the 222th provincial read and underground fiber optic cable from adverse impact. The design and calculation of the dug pile wall structure were introduced in detail in this paper; it can be referred to by similar engineering.
Keywords:railway super-large bridge  dug pile wall structure  protection system  design and calculation
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号