首页 | 本学科首页   官方微博 | 高级检索  
     检索      

南京长江第三大桥钢塔柱安装
引用本文:胡冬勇,李宗平,唐启.南京长江第三大桥钢塔柱安装[J].现代交通技术,2006,3(2):33-36.
作者姓名:胡冬勇  李宗平  唐启
作者单位:中港第二航务工程局,湖北,武汉,430050
摘    要:南京三桥主桥为钢塔铜箱梁双索面五跨连续斜拉桥,塔柱下横梁以上采用钢塔柱的结构型式。本文介绍该桥钢塔柱安装基本情况、安装设备、安装步骤及其关键工艺和方法。

关 键 词:钢混结合段  钢塔柱  钢横梁  安装工艺
文章编号:1672-9889(2006)02-0033-04
收稿时间:2005-08-09
修稿时间:2005年8月9日

Installation of Steel Tower Pillar of Nanjing NO.3 Yangtze River Bridge
Hu Dongyong,Li Zongping,Tang Qi.Installation of Steel Tower Pillar of Nanjing NO.3 Yangtze River Bridge[J].Modern Transportation Technology,2006,3(2):33-36.
Authors:Hu Dongyong  Li Zongping  Tang Qi
Institution:The Second Engineering Company of China Harbour Engineering, Wuhan 430050, China
Abstract:Main bridge of Nanjing NO.3 Yangtze river bridge consist of five across continuous cable-stayed bridge of steel tower and steel beam,the tower above the beam adopts steel tower pillar,this paper describes the basic circumstance of installation, the equipments of installation and the key technology of the installation.
Keywords:steel concrete combination segment  steel tower  horizontal beam in steel  installation technology
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号