首页 | 本学科首页   官方微博 | 高级检索  
     

北江白石窑水利枢纽坝下变动回水区航道整治试验研究*
引用本文:费晓昕,张绪进,倪志辉,杨文浩,王明会. 北江白石窑水利枢纽坝下变动回水区航道整治试验研究*[J]. 水运工程, 2013, 0(4): 146-150
作者姓名:费晓昕  张绪进  倪志辉  杨文浩  王明会
作者单位:1. 重庆交通大学河海学院,重庆,400074
2. 重庆交通大学西南水运工程科学研究所,重庆,400016
基金项目:2012年度省部共建水利水运工程教育部重点实验室暨国家内河航道整治工程技术研究中心开放基金(SLK2012A02)
摘    要:
北江白石窑枢纽坝下变动回水区是北江中游重要的碍航浅滩.整治前,航槽水浅,船舶须减载或等水航行,塞船现象常有发生,维护水深仅在0.8~1.0 m,甚至断航现象时有发生,实施航道整治工程十分必要.为达到Ⅲ级航道标准,本文在分析浅滩的演变特点基础上,开发了河工模型,充分利用前整治建筑物,以因势利导为原则,利用挖槽、整治丁坝和疏浚等工程措施,对2个Ⅲ级航道整治方案进行对比分析,提出整治方案.从分析结果来看,此河段达到2.5 m×60 m的航道尺度是切实可行的.

关 键 词:航道整治  浅滩  变动回水区  回淤量

Model experiment on fluctuating backwater area under the dam of Beijiang Baishiyao water conservancy
FEI Xiao-xin,ZHANG Xu-jin,NI Zhi-hui,YANG Wen-hao and WANG Ming-hui. Model experiment on fluctuating backwater area under the dam of Beijiang Baishiyao water conservancy[J]. Port & Waterway Engineering, 2013, 0(4): 146-150
Authors:FEI Xiao-xin  ZHANG Xu-jin  NI Zhi-hui  YANG Wen-hao  WANG Ming-hui
Affiliation:School of River and Ocean Engineering, Chongqing Jiaotong University, Chongqing 400074, China;The Southwest Waterway Engineering Institute, Chongqing Jiaotong University, Chongqing 400016, China;The Southwest Waterway Engineering Institute, Chongqing Jiaotong University, Chongqing 400016, China;School of River and Ocean Engineering, Chongqing Jiaotong University, Chongqing 400074, China;School of River and Ocean Engineering, Chongqing Jiaotong University, Chongqing 400074, China
Abstract:
The fluctuating backwater area under the dam of Beijiang Baishiyao water conservancy is an importantnavigation obstacle shoal to the middle of North River. Before waterway regulation engineering, the depth of waterway isshallow, so ships must reduce the load or delay sailing. Ship jam often occurs and water depth keeps only between 0.8~1.0 m.Even suspension of shipping occurs from time to time, so waterway regulation engineering is necessary. In order to achieveClass-III channels, this paper analyzes the characters of the evolution of these shoals, develops a river work model,takes full advantage of the regulating structures and makes the best use of the general trend, and takes appropriatemeasures to analyze the two waterway regulation schemes of Class - III channels, then proposes regulation scheme.According to the analysis result, it is feasible for the reach to achieve the waterway scale of 2.5 m×60 m.
Keywords:waterway regulation engineering   shallow   fluctuating backwater area   sediment erosion and depositionregulation measure
本文献已被 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号