首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高桩码头施工新工艺应用
引用本文:王兴坤,孙国峰,张轩维.高桩码头施工新工艺应用[J].水运工程,2019(S1):9-11.
作者姓名:王兴坤  孙国峰  张轩维
作者单位:中交第一航务工程局有限公司,天津 300461,中交一航局第五工程有限公司,河北 秦皇岛 066002,中国石油广东石化分公司,广东 揭阳 522000
摘    要:以某高桩码头为例,针对在恶劣海况条件下海上梁板安装施工效率低、海上搅拌船浇筑混凝土施工成本高等问题,进行了工艺创新,采用架桥机安装预制梁板、泵车上船浇筑混凝土、预制梁采用大理石底胎等新工艺及方法,很好地避免了恶劣海况对预制梁板安装的影响并控制了施工成本。

关 键 词:架桥机  泵车上船  海上现浇混凝土  大理石底胎

Application of new construction technology for high pile wharf
WANG Xing-kun,SUN Guo-feng and ZHANG Xuan-Wei.Application of new construction technology for high pile wharf[J].Port & Waterway Engineering,2019(S1):9-11.
Authors:WANG Xing-kun  SUN Guo-feng and ZHANG Xuan-Wei
Abstract:Taking a high-piled wharf as an example,aiming at the problems of low efficiency of installation and construction of beam and slab on the sea and high construction cost of concrete pouring by mixing vessel on the sea under harsh sea conditions,technological innovation was carried out,such as bridge erecting machine to install prefabricated beam slab,pump truck to pour concrete on board,prefabricated beam using marble bottom tire and other new technologies and methods,which well avoided the influence of bad sea conditions on the installation of prefabricated beam slab and controlled the construction cost.
Keywords:bridge erector  pump truck on board  offshore cast-in-place concrete  marble bottom tire
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏