首页 | 本学科首页   官方微博 | 高级检索  
     

“钢板凳”与套箱组合施工河床无覆盖层处桥梁桩基工法浅谈
引用本文:谢劲辉. “钢板凳”与套箱组合施工河床无覆盖层处桥梁桩基工法浅谈[J]. 北方交通, 2010, 0(3): 65-67
作者姓名:谢劲辉
作者单位:中铁二十二局集团第三工程有限公司,厦门,361000
摘    要:
在山区河流建桥,经常碰到因水流冲刷造成岩面裸露而无覆盖层的情况,对吉首至怀化高速公路舞水大桥对该种地质情况处桥梁施工工法进行了简要介绍,以供参考。

关 键 词:河流  无覆盖层  桥梁桩基  工法

Bridge Pile Foundation Construction Combined with "Steel Stool" and Set Cases on Riverbed without Coating
XIE Jin-hui. Bridge Pile Foundation Construction Combined with "Steel Stool" and Set Cases on Riverbed without Coating[J]. , 2010, 0(3): 65-67
Authors:XIE Jin-hui
Affiliation:XIE Jin-hui
Abstract:
Bridges built at mountain areas and rivers often face the problems of washing by flow water and causing rock bareness without coating,the construction of Wushui Bridge at Jishou to Huaihua Expressway is introduced,which provides references to construction at this kind of geological conditions.
Keywords:River  Without coating  Bridge pile foundation  Construction technique  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号