首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大桥主墩沉井施工方案及监控
引用本文:赵家庶.大桥主墩沉井施工方案及监控[J].铁道技术监督,2007,35(4):26-27.
作者姓名:赵家庶
作者单位:中铁十四局集团有限公司,山东,济南,250014
摘    要:沉井下沉是沉井施工的一个关键工序,也是一项工程成败的关键,因此做好沉井下沉是一项工程的重中之重。本文结合印度泰米尔纳度邦凯瑞大桥的沉井施工,重点阐述了钢壳沉井在不同地质情况下下沉时出现的各种问题,及其解决方案。

关 键 词:大桥  沉井  下沉  解决方案
文章编号:1006-9178(2007)04-0026-02
收稿时间:2007-01-08
修稿时间:2007年1月8日

Open Caisson Construction Scheme on Main Piers of Extra-long Bridges and the Monitoring & Control
Zhao Jiashu.Open Caisson Construction Scheme on Main Piers of Extra-long Bridges and the Monitoring & Control[J].Railway Quality Control,2007,35(4):26-27.
Authors:Zhao Jiashu
Institution:Zhao Jiashu
Abstract:Sinking of open caisson is the key procedure during construction, success of which will put great positive influence on the execution of the entire project. Thus, it is the key point to do this procedure well. On the basis of the experience of open caisson experience in the construction of Kaveri Bridge in Tamil Nadu of India, this paper illustrates different problems that might be met during the sinking of steel shell open caisson in various geological stratum, and the solutions are put forwards also.
Keywords:Extra-long Bridge  Open Caisson  Sinking  Solution
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号