首页 | 本学科首页   官方微博 | 高级检索  
     检索      

三峡库区锚地浮箱岸电设施的设计
引用本文:宋文涛,陈仲盛,王海滨.三峡库区锚地浮箱岸电设施的设计[J].水运工程,2019(5):147-151.
作者姓名:宋文涛  陈仲盛  王海滨
作者单位:中交第二航务工程勘察设计院有限公司,湖北 武汉 430060,中交第二航务工程勘察设计院有限公司,湖北 武汉 430060,长江三峡通航管理局,湖北 宜昌 443002
摘    要:针对三峡库区大水位差下的船舶供电需求,基于浮箱能够随水位同步变化的原理,设计了一套浮箱岸电设施。该设施利用浮箱在导向架内的上下浮动以适应不同的水位,通过上下两层的结构适应不同干舷高度下船舶的供电;利用雷达式水位计获取水位信息,将其传递给电缆卷筒的变频控制器,通过控制系统的逻辑编辑,从而实现电缆在水位发生变化时的准确收放。通过对现有技术的分析,论证了该系统的可行性和科学性,为工程的设计提供理论支撑。

关 键 词:三峡库区  大水位差  浮箱岸电设施  变频控制

Design of pontoon type shore-to-ship power supply system for anchorage in Three Gorges reservoir area
SONG Wen-tao,CHEN Zhong-sheng and WANG Hai-bin.Design of pontoon type shore-to-ship power supply system for anchorage in Three Gorges reservoir area[J].Port & Waterway Engineering,2019(5):147-151.
Authors:SONG Wen-tao  CHEN Zhong-sheng and WANG Hai-bin
Institution:CCCC Second Harbor Consultants Co.,Ltd.,Wuhan 430060,China,CCCC Second Harbor Consultants Co.,Ltd.,Wuhan 430060,China and Three Gorges Navigation Authority,Yichang 443002,China
Abstract:In view of the shore-to-ship power supply under the large water level difference condition in the Three Gorges reservoir area,a new shore-to-ship power supply system has been designed based on pontoon which can adapt to water level change.The facility adapts to different water levels by floating the pontoon up and down in the guide frame and adapts to the power supply of the ship at different free board heights through the two-story structure.The radar water level gauge is used to obtain the water level information,which is transmitted to the frequency conversion controller of the cable reel.Through the logic edit of the control system,the accurate retracting and releasing of the cable can be realized when the water level changes.Through the analysis of the existing technology,the feasibility and scientific of this system are proved,which provide the theoretical support for engineering design.
Keywords:Three Gorges reservoir area  large water level difference  pontoon type shore-to-ship power supply system  frequency conversion control
本文献已被 CNKI 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号