首页 | 本学科首页   官方微博 | 高级检索  
     检索      

预应力锚索桩板式挡墙肋桩施工工艺
引用本文:朱黎.预应力锚索桩板式挡墙肋桩施工工艺[J].西部交通科技,2012(5):19-21,29.
作者姓名:朱黎
作者单位:云南省红河州高等级公路管理局,云南红河,661100
摘    要:文章以云南省红河州个屯一级公路某桥梁预应力锚索桩板式挡墙施工为例,在计算分析挡墙稳定性的基础上,阐述了预应力锚索桩板式挡墙肋桩施工的工艺流程及要点,并提出了相应的挡墙肋桩施工验收及监管措施。

关 键 词:预应力锚索桩板式挡墙  肋桩  施工工艺

Construction Process of Rib Pile in Prestressed Anchor Cable Pileplate Retaining Wall
ZHU Li.Construction Process of Rib Pile in Prestressed Anchor Cable Pileplate Retaining Wall[J].Western China Communication Science & Technology,2012(5):19-21,29.
Authors:ZHU Li
Institution:ZHU Li (Honghe State High-grade Highway Administration Bureau of Yunnan, Honghe, Yunnan, 661100)
Abstract:With the construction of prestressed anchor cable pile-plate retaining wall of a bridge in Honghe State Getun First-level Highway of Yunnan as the case, on the basis of calculating and' analyzing the retaining wail stability, the article described the technical process and key points of the rib pile construction of prestressed anchor cable pile-plata retaining wall,and proposed the corresponding acceptance and regulatory measures of re-tai - ning wall rib pile construction.
Keywords:Prestressed anchor cable pile-plate retaining waU  Rib pile  Construction process
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号