武康铁路二线既有文畈大桥左线T梁平移及加固
引用本文:宋海涛.武康铁路二线既有文畈大桥左线T梁平移及加固[J].隧道建设,2008,28(1):105-109.
作者姓名:宋海涛
作者单位:中铁隧道集团二处有限公司,河北,三河,065201
摘    要:根据既有文畈大桥左线T梁平移和加固设计,并结合现场的实际情况,有针对性的提出了梁体平移及加固方案,并对施工工艺进行了阐述;由于是既有线施工,同时对施工过程中采取的安全措施、人员防护和机具配备等情况进行了介绍。

关 键 词:既有大桥T梁平移加固方案
收稿时间:2007-09-03
修稿时间:2007年9月3日

Translation and Reinforcement of LeR T-girder of Existing Wenfan Bridge on Wu-Kang Double-track Railway Project
SONG Haitao.Translation and Reinforcement of LeR T-girder of Existing Wenfan Bridge on Wu-Kang Double-track Railway Project[J].Tunnel Construction,2008,28(1):105-109.
Authors:SONG Haitao
Institution:The 2nd Engineering Co., Ltd. of China Railway Tunnel Group
Abstract: A translation and reinforcement plan is proposed  for the left T girder of the existing Wenfan bridge on basis of the design and actual conditions of the job site. For the sake of construction of existing railway, the safety guarantee measures, labor protection and equipment matching for the construction are also expounded.
Keywords: existing bridgeT girder translationreinforcementplan