首页 | 本学科首页   官方微博 | 高级检索  
     检索      

集装箱中心站装卸作业线接触网终点设计
引用本文:杨念.集装箱中心站装卸作业线接触网终点设计[J].电气化铁道,2010,21(2):35-36,40.
作者姓名:杨念
作者单位:中铁二院武汉勘察设计研究院有限责任公司,湖北武汉,430071
摘    要:在接触网终点设计常规下锚结构形式下,集装箱中心站龙门吊装卸作业线股道接触网终点的有效行车距离无法满足电力机车直接摘挂货物列车要求。本文针对该问题提出了新型的接触网终点下锚结构形式,改进后的下锚结构形式能在不影响龙门吊作业的前提下延长接触网终点有效行车距离,满足电力机车直接摘挂取送货物列车的要求。

关 键 词:龙门吊装卸作业线  接触网终点  电力机车  有效行车距离  下锚结构形式

Container Center Loading and Unloading operation Line Overhead Contact Line Terminal Design
YANG Nian.Container Center Loading and Unloading operation Line Overhead Contact Line Terminal Design[J].Electric Railway,2010,21(2):35-36,40.
Authors:YANG Nian
Abstract:With the regular anchorage structure in the endpoint of OCS design, the effective running distance of the endpoint of OCS in a handling operation line with gantry crane in the container center station couldn't meet the requirement that electric locomotives get access to freight trains. Aiming at this problem, this article suggests a new form of anchorage structure in the endpoint of OCS. Without influencing the operation of gantry crane, the improved anchorage could extend the effective running distance of the endpoint of OCS and meet the need that the electric locomotive directly hitches and delivers a freight train.
Keywords:handling operation line with gantry crane  the endpoint of OCS  electric locomotive  the effective running distance  anchorage structure    
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号