首页 | 本学科首页   官方微博 | 高级检索  
     检索      

地下商城静压群桩施工对紧邻地铁车站影响的控制技术
引用本文:沈敏,陶利.地下商城静压群桩施工对紧邻地铁车站影响的控制技术[J].地下工程与隧道,2009(2):13-16.
作者姓名:沈敏  陶利
作者单位:上海隧道工程股份有限公司;
摘    要:介绍了上海轨道交通9号线二期工程6A标段——徐家汇地下商城向下加层工程中低净空条件下的静压钢管群桩施工对周边环境的影响。通过严谨、合理的施工工艺、压桩工序以及施工监测,确保了压桩施工的顺利进行,可供类似条件下的静压桩施工参考。

关 键 词:地铁车站  低净空  向下盖挖加层  静压钢管群桩  施工技术  

Control Technology of Effect on Neighboring Metro Station from Pile Group Static Pressing Construction in Basement
Shen Min,Tao Li.Control Technology of Effect on Neighboring Metro Station from Pile Group Static Pressing Construction in Basement[J].Underground Engineering and Tunnels,2009(2):13-16.
Authors:Shen Min  Tao Li
Abstract:It introduced the impact on environment from the 6A contract section of the 2nd phase of Shanghai Rail Transit Line 9.The 6A contract section makes a construction of static pressure steel pipe pile group under a lower clearance condition.Through precise and rational construction technique,construction sequence,and information based construction,pile-pressing construction is successful,providing the reference for that under similar condition.
Keywords:
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号