首页 | 本学科首页   官方微博 | 高级检索  
     检索      

南京长江隧道复合地层及江中冲槽段施工技术研究
引用本文:付道兴.南京长江隧道复合地层及江中冲槽段施工技术研究[J].现代交通技术,2009,6(6):78-81.
作者姓名:付道兴
作者单位:南京长江隧道有限责任公司,江苏,南京,210008
摘    要:水下盾构隧道施工风险控制是工程成败的关键问题,以南京长江隧道为工程背景,对大型泥水盾构特殊地段施工重大风险及应对措施进行分析和探讨,为类似工程施工风险控制提供参考。

关 键 词:隧道工程  风险控制  盾构

Research on the Construction Technology of Mix Ground and Necking Region of Nanjing Cross-river Tunnel
Fu Daoxing.Research on the Construction Technology of Mix Ground and Necking Region of Nanjing Cross-river Tunnel[J].Modern Transportation Technology,2009,6(6):78-81.
Authors:Fu Daoxing
Institution:Fu Daoxing (Nanjing Yangtze River Tunnel Co.,Ltd. ,Nanjing 210008,China)
Abstract:Risk control is the key issue of underwater shield tunnel construction project. Based on Nanjing Yangtze River Tunnel,construction technology research on mix ground and necking region are taken,corresponding technical measures are also discussed. The Works can provide reference for similar projects construction.
Keywords:tunnel engineering  construction risking  shield
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号