节理密集带地质硬岩TBM刀盘损坏形式及对策
引用本文:黄文鹏.节理密集带地质硬岩TBM刀盘损坏形式及对策[J].隧道建设,2012,32(4):587-593.
作者姓名:黄文鹏
作者单位:中铁隧道股份有限公司,郑州450001
摘    要:为解决硬岩TBM在硬岩节理密集带地质段施工时,刀盘刀具损坏严重、施工效率低下、施工成本增加问题,针对中天山铁路工程硬岩TBM节理密集段现场施工情况,分析刀盘刀具的主要损坏形式及主要原因,并采取相应的改进措施,使硬岩TBM在节理密集带地质段掘进顺利进行,保证了施工进度,降低了施工成本,对类似工程具有一定的借鉴作用。

关 键 词:中天山隧道  节理密集带  硬岩TBM  刀盘  损坏形式
收稿时间:2012-05-17

Study on Damage of Hard Rock TBM Induced by Tunneling Through Joint-densely-developed Hard Rock Section and Countermeasures
HUANG Wenpeng.Study on Damage of Hard Rock TBM Induced by Tunneling Through Joint-densely-developed Hard Rock Section and Countermeasures[J].Tunnel Construction,2012,32(4):587-593.
Authors:HUANG Wenpeng
Institution:HUANG Wenpeng ( China Railway Tunnel Stock Co. , Ltd. , Zhengzhou 450001, China)
Abstract:When hard rock TBM drives through jointdenselydeveloped hard rock section during the construction of Zhongtianshan railway tunnel, the cutter head and cutting tools are seriously damaged, the driving efficiency is lowered and the construction cost is increased. The modes and lyzed and countermeasures are proposed. In the end, causes of the damage of the cutter head and cutting tools are ana successful driving through the jointdenselydeveloped hard rock section is achieved, the construction schedule is guaranteed, and the construction cost is reduced. The paper can pro vide reference for similar projects in the future.
Keywords:Zhongtianshan tunnel  joint-densely-developed section  hard rock TBM  cutter head  damage mode