首页 | 本学科首页   官方微博 | 高级检索  
     检索      

CFG桩帽混凝土完全湿揭法的施工与检测效果
引用本文:常聚友.CFG桩帽混凝土完全湿揭法的施工与检测效果[J].路基工程,2011,0(1):155-158.
作者姓名:常聚友
作者单位:中铁二院工程集团有限责任公司, 成都 610031
摘    要:由反射波法检测CFG桩(桩帽)完整性,一些桩的反射波曲线为正弦波衰减、周期大、无桩底反射信号,经分析和验证,原因是施工桩时,造成了桩浅部垂向裂纹、水平断裂、桩帽与桩没有连结成一体。为确保CFG桩(桩帽)质量完整,采用CFG桩帽混凝土完全湿揭法施工,效果良好。

关 键 词:CFG桩    桩身(桩帽)完整性    施工措施    混凝土完全湿揭法    质量控制
收稿时间:2019-11-10

Construction and Detection Effect of CFG Pile Cap Using Concrete Completely Wet Uncovering Process
Authors:CHANG Ju-you
Institution:CHANG Ju-you(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu,610031,China)
Abstract:Through detecting CFG pile(pile cap) integrity using reflection method,it is shown that reflection curve of some piles is featured of sine wave attenuation,long period and no reflected signal from pile bottom,which are caused by pile shadow vertical crack,horizontal crack,separation between pile cap and pile body during construction through analysis and verification.In order to ensure CFG pile(pile cap) integrity,concrete completely wet uncovering process shall be applied for CFG pile cap with good effect.
Keywords:cement-flyash-gravel pile(CFG pile)  pile(pile cap) integrity  construction measures  concrete completely wet uncovering process  quality control  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《路基工程》浏览原始摘要信息
点击此处可从《路基工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号