泉州晋江斜拉桥主梁边跨合拢段施工 |
| |
引用本文: | 付国平. 泉州晋江斜拉桥主梁边跨合拢段施工[J]. 辽宁交通科技, 2008, 0(5): 143-145 |
| |
作者姓名: | 付国平 |
| |
作者单位: | [1]中铁大桥局集团二公司,南京210015 |
| |
摘 要: | 介绍泉州晋江斜拉桥的概况及边跨合拢施工技术、施工流程等。
|
关 键 词: | 斜拉桥 合拢施工 劲性骨架 温差效应 |
Construction of Folding Section of Side Spans of Main Girder of Cable Stayed Bridge over Quanzhou Jinjiang River |
| |
Abstract: | The paper introduces general situation of cable stayed bridge over Jinjiang River, techniques for side spans folding and Construction process etc. |
| |
Keywords: | Cable stayed bridge Folding construction Stiff skeleton Effect of temp difference |
本文献已被 维普 等数据库收录! |
|