三向预应力混凝土箱梁桥拓宽改造箱梁翼缘板连接结构研究
引用本文:吴文清,赵昊,章世祥.三向预应力混凝土箱梁桥拓宽改造箱梁翼缘板连接结构研究[J].桥梁建设,2020,50(2):13-18.
作者姓名:吴文清  赵昊  章世祥
作者单位:东南大学交通学院,江苏南京211189;东南大学交通学院,江苏南京211189;江苏省南京市鼓楼区下关街道,江苏南京210011;中设设计集团股份有限公司,江苏南京210014
基金项目:江苏省重点研发计划-产业前瞻与共性关键技术项目(BE2018120)。
摘    要:为解决三向预应力混凝土连续箱梁桥拓宽时的拼接难题,提出一种适用于箱梁翼缘板横向拼接的嵌入式钢板连接结构,以京沪高速公路盐河大桥为背景进行研究。采用MIDAS FEA软件建立全桥有限元模型,分析该结构在混凝土收缩徐变差、基础沉降差、车道荷载作用下的结构响应、横向传力机理,并对若干影响参数进行敏感性分析。结果表明:该连接结构能够形成横向传力通道,有效吸收新、旧桥间发生的纵向变形差异作用,满足横向拼接需要,结构可行;嵌入式钢板通过区域应力状态的连续改变完成了内力横向传递;嵌入式钢板厚度、布置间距、拼接缝宽度对钢板的应力影响明显,而钢板宽度对其影响相对较小。

关 键 词:连续梁桥  预应力混凝土结构  箱形梁  桥梁拓宽  嵌入式钢板  有限元法  传力机理

Study of Connection Details of Box Girder Flanges in Widening of Three-Way Prestressed Concrete Box Girder Bridge
WU Wen-qing,ZHAO Hao,ZHANG Shi-xiang.Study of Connection Details of Box Girder Flanges in Widening of Three-Way Prestressed Concrete Box Girder Bridge[J].Bridge Construction,2020,50(2):13-18.
Authors:WU Wen-qing  ZHAO Hao  ZHANG Shi-xiang
Institution:(School of Transportation, Southeast University, Nanjing 211189, China;Xiaguan Street, Gulou District, Nanjing City, Jiangsu Province, Nanjing 210011, China;China Design Group Co. , Ltd. , Nanjing 210014, China)
Abstract:When the three-way prestressed concrete continuous box girder bridge is widened,the connection of the old and new structures remains a problem.A connection realized by embedding steel plates that is applicable for transverse splicing of box girder flanges is proposed,and the Yanhe River Bridge on Beijing-Shanghai Expressway is taken as the background project for the study.The software MIDAS FEA was used to build the finite element model of the full bridge,to analyze the structural response and transverse load transfer mechanism under the action of shrinkage and creep difference of new and old concrete,foundation settlement difference and vehicle loads.Parametric sensitivity of a variety of influential factors was analyzed.The results show that the connection details can form transverse load transfer passages,and therefore,effectively absorb the longitudinal deformation difference between the new and existing structures.Embedding steel plates can fulfill the requirements of transverse splicing and create a feasible way of connection.The embedded steel plates can transversely transfer the internal forces via the continual change of local stress condition.The thickness and spacing of embedded steel plates and width of the splicing joint have significant influence on the stresses in the steel plates,but the influence of width of steel plates is relatively minimal.
Keywords:continuous girder bridge  prestressed concrete structure  box girder  bridge widening  embedded steel plate  finite element method  load transfer mechanism