大跨度地锚式斜拉桥综合维护关键技术
引用本文:林一宁. 大跨度地锚式斜拉桥综合维护关键技术[J]. 桥梁建设, 2020, 50(2): 99-104
作者姓名:林一宁
作者单位:中铁大桥局武汉桥梁特种技术有限公司,湖北武汉430074;桥梁结构健康与安全国家重点实验室,湖北武汉430034
摘    要:郧县汉江大桥为主跨414 m的地锚式预应力混凝土双塔双索面斜拉桥,每塔两侧各布置50根斜拉索,跨中设置4个无轴力中间铰。该桥于1994年建成,2014年检测发现斜拉索破损严重,4个无轴力中间铰均出现一端卡死现象,主桥被评定为四类桥梁,需进行全桥综合维护。根据病害情况,先更换损坏严重的21根斜拉索;再按单塔对称、双塔反对称2根索同时更换的原则更换20~25号斜拉索;最后按双塔反对称4根索同时更换的原则更换1~19号斜拉索。全桥200根斜拉索更换后调整索力和梁体标高,采用拖拉法校正无轴力中间铰。无轴力中间铰校正后,在其端部和跨中断缝处安装监测系统,监测其工作状态。监测结果表明,无轴力中间铰能够纵向自由滑移,工作状态良好。

关 键 词:地锚式斜拉桥  无轴力中间铰  斜拉索  旧索钢丝  受力状态  维修校正  桥梁维修

Key Techniques for Integrated Maintenance of Long-Span Earth-Anchored Cable-Stayed Bridge
LIN Yi-ning. Key Techniques for Integrated Maintenance of Long-Span Earth-Anchored Cable-Stayed Bridge[J]. Bridge Construction, 2020, 50(2): 99-104
Authors:LIN Yi-ning
Affiliation:(Wuhan Bridge Special Technology Co. , Ltd. , China Railway Major Bridge Engineering Group, Wuhan 430074, China;State Key Laboratory for Health and Safety of Bridge Structures, Wuhan 430034, China)
Abstract:The Hanjiang River Bridge in Yun County is a two-pylon earth-anchored prestressed concrete cable-stayed bridge with a main span of 414 m.The stay cables are fanned out in double cable planes,on each side of the pylon,a number of 2×25 stay cables are tensioned.Four central hinges without axial forces are installed in midspan.The bridge was opened to traffic in 1994,and the 2014 inspections revealed multiple damages,including the stay cable damage and one end stuck of the axial-force-free central hinges,as a result,the bridge was evaluated as GradeⅣdeteriorated structure,and an integrated maintenance for the whole bridge was needed.According to the degree of damages,the 21 stay cables that were severely damaged were replaced first.Then,the stay cables 20-25 were replaced,two at a time,by the way of replacing the stay cables from the same pylon symmetrically and from different pylons asymmetrically.And the stay cables 1-19 were replaced,four at a time,by the way of replacing the stay cables from different pylons asymmetrically.After all the 200 stay cables were replaced,the cable forces and girder elevation were adjusted,and the central hinges without axial forces were calibrated by the dragging method,then,monitoring system was installed in the girder ends and joints in midspan to monitor their working condition.The results demonstrate that the central hinges without axial forces can move freely in the longitudinal direction and their working condition is good.
Keywords:earth-anchored cable-stayed bridge  central hinge without axial force  stay cable  steel wire of old cable  load bearing condition  maintenance and calibration  bridge rehabilitation