首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Installation strength analysis of subsea flowline jumpers
Authors:Liping?Sun  Email author" target="_blank">Youwei?KangEmail author
Institution:1.College of Shipbuilding,Harbin Engineering University,Harbin,China
Abstract:Subsea flowline jumper (FJ) is basic connection component for the wet oil tree, the subsea pipeline and the riser base, playing an irreplaceable role in the subsea production system. During the installation of FJ, collisions often happen between FJ and other equipment, which may cause serious damage. Besides, as the operating water depth increases, the demand for the installation equipments like the crane and winch will increase. The research of deepwater FJ installation in China is still in the primary stage, so an installation method for deepwater FJ is proposed in this paper. Finite element models of a typical M-shape FJ installation system were built to simulate the installation procedures. Analysis results showed that the installation steps designed for the FJ are feasible and valid for deepwater FJ. In order to ensure the safety of the installation process, the collision-sensitive analysis for the FJ was conducted, and results show that it is necessary to set the pick up speed at a proper value, in order to avoid collision in installation process. Besides, the mechanical characteristics of FJ during the installation were investigated under a range of environmental conditions and it was found that the maximum stress of the FJ always happens at its central position. The basic requirements for the installation equipment were also obtained through the analysis of the main installation steps.
Keywords:
本文献已被 万方数据 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号