首页 | 本学科首页   官方微博 | 高级检索  
     检索      

面向调移车辆数优化的摘挂列车调车作业计划编制方法
引用本文:张博健,彭其渊,李力,鲁工圆.面向调移车辆数优化的摘挂列车调车作业计划编制方法[J].铁道学报,2020(3):11-20.
作者姓名:张博健  彭其渊  李力  鲁工圆
作者单位:西南交通大学交通运输与物流学院;西南交通大学综合交通运输智能化国家地方联合工程实验室
基金项目:国家自然科学基金(U1834209,61603317);中央高校基本科研业务费(2682016CX057)。
摘    要:调车作业计划是规定车辆如何调移及其作业程序的具体行动计划。提出了在调车钩数最优前提下以减少调移车辆数为目标的摘挂列车调车作业计划编制方法,构建了摘挂列车调车作业计划编制0-1线性优化模型,并设计了基于消逆规则的启发式分支定界算法对模型进行求解。算例表明,所提出的方法能够求解出调车钩数不劣于统筹对口法且调移车辆数更少的调车作业计划,在给出的算例中总调移车辆数减少了约20%。所提出的方法能够对调移车辆数进行优化,对调车作业计划编制质量的进一步提高、调车过程能耗降低等方面有积极意义。

关 键 词:摘挂列车  调车作业计划  调移车辆数  整数线性规划模型  分支定界算法

Train Shunting Operation Scheduling with Number of Wagon Moves Oriented Optimization
ZHANG Bojian,PENG Qiyuan,LI Li,LU Gongyuan.Train Shunting Operation Scheduling with Number of Wagon Moves Oriented Optimization[J].Journal of the China railway Society,2020(3):11-20.
Authors:ZHANG Bojian  PENG Qiyuan  LI Li  LU Gongyuan
Institution:(School of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,China;National United Engineering Laboratory of Integrated and Intelligent Transportation,Southwest Jiaotong University,Chengdu 610031,China)
Abstract:Train shunting operation schedule is a specific action schedule for the regulation of number of wagon moves and its operation procedures.Aiming at minimizing the weighted value of shunting hooks and the number of wagon moves,the 0-1 linear programming model was used to describe the shunting operation plan problem of train detaching and attaching,and a heuristic branch and bound algorithm based on the rule of inverse-order elimination was designed to solve the problem.A series of numerical experiments show that the proposed method can solve the shunting operation schedule with fewer number of wagon moves and with the number of shunting hooks not being inferior to the overall planning and coordinating method.The total number of wagon moves is reduced by 20%in the given example.The method proposed in this paper,which can optimize the number of wagon moves,has positive significance in further improving the quality of train shunting operation schedule and reducing energy consumption in shunting process.
Keywords:detaching and attaching trains  train shunting operation schedule  number of wagon moves  Integer Linear programming  branch and bound algorithm
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号