高速铁路40 m跨度预制后张法预应力混凝土简支箱梁试验研究
引用本文:陈胜利,苏永华,石龙,班新林.高速铁路40 m跨度预制后张法预应力混凝土简支箱梁试验研究[J].铁道建筑,2020(4):111-114,132.
作者姓名:陈胜利  苏永华  石龙  班新林
作者单位:中国铁道科学研究院集团有限公司铁道建筑研究所;高速铁路轨道技术国家重点实验室
基金项目:中国铁路总公司科技研究开发计划(2017G006-D);中国铁道科学研究院基金(2017YJ023)。
摘    要:高速铁路40 m跨度预制后张法预应力混凝土简支箱梁首次在我国郑济高速铁路郑州至濮阳段黄河特大桥北岸引桥进行工程应用。为了验证其预制工艺和结构受力性能是否满足规范要求,以3孔工程梁为试验对象开展了混凝土水化热测试、摩阻测试、预应力终张拉效果测试和静载弯曲试验。结果表明:试验梁水化热测试结果和浇筑工艺合格,预应力施加准确,预应力效果满足设计要求;试验梁抗裂安全性满足规范要求。3孔试验梁预制工艺和结构受力性能满足规范要求,40 m跨度简支箱梁可以推广使用。

关 键 词:高速铁路  40m跨度简支箱梁  预应力  后张法  水化热  摩阻  静载弯曲试验

Experimental Research of 40 m Span Prestressed Concrete Simply Supported Box Girder with Precast Post-tensioned Method of High Speed Railway
CHEN Shengli,SU Yonghua,SHI Long,BAN Xinlin.Experimental Research of 40 m Span Prestressed Concrete Simply Supported Box Girder with Precast Post-tensioned Method of High Speed Railway[J].Railway Engineering,2020(4):111-114,132.
Authors:CHEN Shengli  SU Yonghua  SHI Long  BAN Xinlin
Institution:(Railway Engineering Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China;State Key Laboratory for Track Technology of High-speed Railway,Beijing 100081,China)
Abstract:40 m prestressed concrete simply supported box girder with precast post-tensioned method of high speed railway was first applied to the north bank approach bridge of Zhengzhou-Puyang Yellow River Bridge in ZhengzhouJinan high speed railway.To verify whether the precast technology and structural mechanical behaviors meet the requirements of the code,three girders were tested for concrete hydration heat,friction,final prestressed tension effects and static bending.The results show that the hydration heat results and the casting process of the test girders are qualified.The application of prestress is accurate and the effect of prestress meets the design requirements.The safety against cracking of the test girders meets the requirement of the code.The prefabrication process and structural mechanical behaviors of the three test girders meet the requirements of the code.The 40 m span simply supported box girder can be widely used.
Keywords:high speed railway  40m span simply supported box girder  prestress  post-tensioned method  hydration heat  friction  static bending test