首页 | 本学科首页   官方微博 | 高级检索  
     检索      

薄壁空心桥墩封顶施工工艺及受力分析
引用本文:李新芳.薄壁空心桥墩封顶施工工艺及受力分析[J].铁道建筑技术,2010(8):9-11.
作者姓名:李新芳
作者单位:中铁十二局集团有限公司,太原,030024
摘    要:结合广(通)昆(明)铁路一平浪双线特大桥施工实例,分析采用预制板方法进行薄壁空心桥墩封顶的结构受力情况,并详细阐述了此封顶方法的施工工艺。

关 键 词:薄壁空心桥墩  预制板  封顶工艺

Construction Technology and Force Analysis for Capping Thin and Hollow Pier
Li Xinfang.Construction Technology and Force Analysis for Capping Thin and Hollow Pier[J].Railway Construction Technology,2010(8):9-11.
Authors:Li Xinfang
Institution:Li Xinfang (China Railway 12th Bureau Group Co. Ltd. , Taiyuan 030024, China)
Abstract:Based on the construction practice of Yipinglang double-track extra-long bridge of Guangtong to Kunming railway, structural force applying to thin and hollow pier with pre-cast slab method in sealing the top construction is analyzed and construction technology is described in details.
Keywords:thin and hollow wall pier  pre-cast slab  capping technology
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号