关于非预应力连续箱梁的施工工艺探讨
引用本文:汤连生.关于非预应力连续箱梁的施工工艺探讨[J].城市道桥与防洪,2005(1):74-75.
作者姓名:汤连生
作者单位:中建八局机械化施工公司,江苏,南京,210000
摘    要:介绍非预应力连续箱梁施工中预拱度的控制 ,以及箱梁底板裂缝的出现和开展 ,并分析其成因 ,从而确保箱梁施工质量满足设计和施工规范要求。

关 键 词:连续箱梁  施工工艺  预拱度  裂缝分析
文章编号:1009-7716(2005)01-0074-02
修稿时间:2004年11月16

Approach to Construction Process of Non-prestressed Continuous Box Beam
Tang Liansheng.Approach to Construction Process of Non-prestressed Continuous Box Beam[J].Urban Roads Bridges & Flood Control,2005(1):74-75.
Authors:Tang Liansheng
Institution:Tang Liansheng
Abstract:The paper introduces the control of camber in the construction of non prestressed continuous box beam, appearance and development of cracks of bottom plate of box beam. It also analyzes the cause so as to ensure the construction quality and meet the requirements of the design and construction specifications.
Keywords:continuous box beam  construction process  camber  crack analysis