首页 | 本学科首页   官方微博 | 高级检索  
     检索      

菜园坝大桥B匝道连续刚构桥施工控制
引用本文:陈思甜,王志鹏,刘鹏,原嫒.菜园坝大桥B匝道连续刚构桥施工控制[J].重庆交通学院学报,2008,27(1):28-31,36.
作者姓名:陈思甜  王志鹏  刘鹏  原嫒
作者单位:重庆交通大学 重庆400074
摘    要:结合菜园坝大桥工程实例,对采用分节段悬臂浇筑施工的连续刚构桥梁结构施工控制进行了研究,提出了切实可行的控制方法。对成桥后的收缩徐变影响进行了专门考虑,增设附加预拱度,合拢后合拢误差小,桥面线形顺畅。

关 键 词:连续刚构  施工控制  收缩徐变
文章编号:1674-0696(2008)01-0028-04
收稿时间:2006-11-15
修稿时间:2006-12-20

Construction Control of Caiyuanba B Ramp Continuous Rigid Frame Bridge
CHEN Si-tian, WANG Zhi-peng, LIU Peng, YUAN Yuan.Construction Control of Caiyuanba B Ramp Continuous Rigid Frame Bridge[J].Journal of Chongqing Jiaotong University,2008,27(1):28-31,36.
Authors:CHEN Si-tian  WANG Zhi-peng  LIU Peng  YUAN Yuan
Abstract:The construction control of continuous rigid frame bridges which were constructed by the segmental cantilever method were studied in the light of engineering practice-Caiyuanba B Ramp Bridge, and the feasible control methods were proposed. Furthermore, influences on shrinkage and creep of the large-span bridge during its service was specially analyzed. An additional camber is considered and advised. The better connecting precision is reached, and the smooth linetype of the bridge can be formed.
Keywords:continuous rigid frame  construction control  shrinkage and creep
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号