洋山港区某抛石围堤航标灯基础工后沉降预测
引用本文:沈树茂,周林根.洋山港区某抛石围堤航标灯基础工后沉降预测[J].水运工程,2017(S1):109-112.
作者姓名:沈树茂  周林根
作者单位:上海国际港务(集团)股份有限公司,上海 200080,中交第三航务工程勘察设计院有限公司,上海 200032
摘    要:基于抛石斜坡堤提出一种工后沉降量预测方法,通过e-p曲线和钻孔探摸方法预测工后沉降量,结合实际沉降监测数据进行工后沉降预测。以洋山深水港区某抛石围堤航标灯建设为例,运用该方法进行预测,在实际工程中得到较好的印证。

关 键 词:沉降预测  抛石围堤  航标灯基础

Post construction settlement prediction of a riprap dike beacon light base in Yangshan Harbor area
SHEN Shumao and ZHOU Lingen.Post construction settlement prediction of a riprap dike beacon light base in Yangshan Harbor area[J].Port & Waterway Engineering,2017(S1):109-112.
Authors:SHEN Shumao and ZHOU Lingen
Institution:Shanghai Internationl Port (Group) Co.,Ltd.,Shanghai 200080,China and CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China
Abstract:Based on the riprap slope,a post-construction settlement prediction method is proposed.The post construction settlement is predicted by the e-p curve and the borehole probing method,and the post construction settlement prediction is made with the actual settlement monitoring data.Taking Yangshan Deepwater Harbor area as an example,this method is used to predict the construction of rubble embankment,and it is proved to be perfect.
Keywords:settlement prediction  riprap dike  beacon light foundation