首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于改进FAHP-FCE的施工企业质量控制评价研究
引用本文:付红安,李晓钟.基于改进FAHP-FCE的施工企业质量控制评价研究[J].兰州铁道学院学报,2014(1):158-162.
作者姓名:付红安  李晓钟
作者单位:兰州交通大学甘肃省道路桥梁与地下工程重点实验室,甘肃兰州730070
摘    要:实现施工企业质量管理的目标是一项工程项目施工管理的首要任务.为了准确评价施工企业的质量控制水平,提出改进意见,在结合影响工程质量的五大因素和实际情况的基础上建立了评价指标体系,采用改进的FAHP方法计算了各指标权重,用FCE法得出了施工企业质量控制水平等级,从而完成了施工企业质量控制评价模型的建立.最后的实证研究,详细描述了基于改进FAHP-FCE的施工企业质量控制评价的计算过程,证实了模型的可操作性,明确了施工企业的优势和不足,为其加强质量控制提供了理论参考.

关 键 词:施工企业  质量控制  改进的FAHP  模糊综合评价

Research on Quality Control Evaluation of Construction Corporate Based on Improved FAHP-FCE Method
FU Hong-an,LI Xiao-zhong.Research on Quality Control Evaluation of Construction Corporate Based on Improved FAHP-FCE Method[J].Journal of Lanzhou Railway University,2014(1):158-162.
Authors:FU Hong-an  LI Xiao-zhong
Institution:(Key Laboratory of Road &- Bridge and Underground Engineering of Gansu Province, Lanzhou Jiaotong University, Lanzhou 730070,China)
Abstract:The achievement of quality management goal of construction enterprise is a primary task of a proj ect construction management.In order to accurately evaluate the quality control level of construction corporate and put forward some improvement suggestions,based on the five maj or factors which influences the engineering quality and the actual situation,evaluation index system is built by using improved FAHP method to calculate the weight of each index and construction enterprise quality control level is obtained by using the fuzzy comprehensive evaluation method. Thus the evaluation model of construction enterprise quality control is completed.Finally based on FAHP-FCE method,an empirical study,which pictures the calculation procedures and verifies the operability of the model,advantages and shortages of construction enterprise are made clearly, and provide a theoretical reference for construction corporate.
Keywords:construction corporate  quality control  improved FAHP  fuzzy comprehensive evalu-ation
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号