大跨公路隧道通过景区公路的施工与监测
引用本文:曹冠凯.大跨公路隧道通过景区公路的施工与监测[J].隧道建设,2006,26(1):67-69,73.
作者姓名:曹冠凯
作者单位:中铁隧道集团三处有限公司
摘    要:万松岭隧道是连接西湖景区与南部地区的新建双向四东道公路隧道。穿越景区既有公路及海军干休所院区。隧道埋深浅,跨度大,地下水位高,既有公路交通量大,地面(路面)沉降要求严格。通过改进施工方法和加强监控量测,有效地控制了地表下沉,确保了公路运营的安全。本文介绍了该工程的施工方法及监测技术。

关 键 词:大跨隧道  景区公路  施工方法  监控量测
收稿时间:2005-10-20
修稿时间:2005-10-20

Construction and Monitoring of Large Span Highway Tunnel Crossing Underneath Highway in Scenic Resort
CAO Guan-kai.Construction and Monitoring of Large Span Highway Tunnel Crossing Underneath Highway in Scenic Resort[J].Tunnel Construction,2006,26(1):67-69,73.
Authors:CAO Guan-kai
Institution:The 3rd Engineering Co., Ltd. of China Railway Tunnel Group
Abstract:Wansongling Tunnel is a newly-built bidirectional four-roadway highway tunnel, which connects Xihu scenic resort and the south area. The tunnel crosses underneath an existing highway in scenic resort and the naval ranking rest home. The tunnel has such features as shallow overburden, large span, high ground water level, busy traffics of the existing highway and strict restrictions on the settlement of the ground surface and road surface. By means of improving the construction method and strengthening the monitoring and measurement, the settlement of the ground surface is effectively controlled and the operation safety of the highway is guaranteed. This paper introduces the construction method and the monitoring and measurement technologies of the tunnel.
Keywords:large span tunnel  highway in scenic resort  construction method  monitoring and measurement