首页 | 本学科首页   官方微博 | 高级检索  
     检索      

桥梁预应力砼管桩基础断桩预防及处理措施探讨
引用本文:黄琛.桥梁预应力砼管桩基础断桩预防及处理措施探讨[J].广东公路交通,2013(3):22-24,46.
作者姓名:黄琛
作者单位:广东省公路勘察规划设计院股份有限公司,广州510507
摘    要:就设计、施工、生产等几个方面分析了桥梁预应力砼管桩基础断桩的原因,并提出了相应的预防和处理方法,降低桥梁管桩基础中断桩的机率,为今后更多桥梁预应力砼管桩基础的设计、施工提供参考。

关 键 词:桥梁  管桩  断桩  预防  处理

Discussion on Prevention and Treatment Measures for Broken Bridge Prestressed Concrete Pipe Pile Foundation
Institution:HUANG Shen (Guangdong Highway Design Institute Co. Ltd. , Guangzhou 510507)
Abstract:In the paper, the causes of broken bridge prestressed concrete pipe pile foundation (hereinafter being referred to as bridge pipe pile foundation) have been systematically analyzed from design, construction, production and other aspects, and the relevant prevention and treatment measures to reduce the probability of broken bridge pipe pile foundation have been pointed out, which can provide reference for the design and construction of the bridge prestressed concrete pipe pile foundation in the future.
Keywords:bridge  pipe pile  foundation  prevention  treatment
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号