海外EPC铁路信号项目设计阶段划分和过程
引用本文:李嘉.海外EPC铁路信号项目设计阶段划分和过程[J].铁路通信信号工程技术,2012,9(3):70-73.
作者姓名:李嘉
作者单位:北京全路通信信号研究设计院有限公司,北京,100073
摘    要:我国铁路工程项目承包长期停留在设计、采购、施工平行建设承包模式上,而国际市场普遍采用"设计—采购—施工总承包"模式(简称EPC总承包)。对海外EPC铁路信号项目设计阶段的划分进行研究,对其理念和工作过程进行分析解释。

关 键 词:海外EPC项目  铁路信号  设计  阶段

Design Stage Division and Process of Oversea Railway Signal EPC Projects
Li Jia.Design Stage Division and Process of Oversea Railway Signal EPC Projects[J].Railway Signalling & Communication Engineering,2012,9(3):70-73.
Authors:Li Jia
Abstract:The parallel contract mode of engineering, procurement, and construction have been applied in our domestic railway engineering projects for a very long time, while the universal contract mode of Engineering-Procurement-Construction (EPC) is commonly adopted in the international market. The paper studies the design stage division in oversea railway signal EPC projects, and gives the analysis and explanation of the concept and working process of EPC projects.
Keywords:oversea EPC project  railway signal  design  stage