金沙江溪洛渡电站水富重大件码头研究 |
| |
引用本文: | 邓宇中,张绪进,杜宗伟.金沙江溪洛渡电站水富重大件码头研究[J].重庆交通大学学报(自然科学版),2003,22(1):100-104. |
| |
作者姓名: | 邓宇中 张绪进 杜宗伟 |
| |
作者单位: | 重庆交通学院,西南水运工程科学研究所,重庆,400016 |
| |
摘 要: | 根据金沙江溪洛渡水电站重大件设备的运输要求,对水富港重大件专用码头的航道条件、港址选择、装卸工艺、平面布置及水工结构等进行可行性研究.该码头所在岸坡较缓、水位变幅和水边线摆动均较大,采用浮吊装卸工艺和顺岸斜坡码头,解决了重大件运输水陆转运的装卸问题,可作为类似工程的参考.
|
关 键 词: | 重大件码头 港址 装卸工艺 金沙江溪洛渡水电站 |
文章编号: | 1001-716X(2003)01-0100-05 |
修稿时间: | 2002年5月21日 |
Study on the heavy cargo wharf for xiluodu hydropower station |
| |
Abstract: | According to the transporting need of the heavy cargo for Xiluodu hydropower station in Jinshajiang River,the following questions on the heavy cargo special wharf in Shuifu port are studied,such as the waterway condition,site selection,load and unload technology,plane layout and hydraulic struture and so on.Because of the gentle bank slope,the larger range of the water level change and water sideline wing at the wharf,the floating crane handling technology and the sloping quay are adopted,the load and unload problem of the water-land transfer of the heavy cargo is solved.It can be refered to the similar wharf project. |
| |
Keywords: | heavy cargo special wharf site selection load and unload technology Xiluodu hydropower station in Jinshajiang River |