首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于排序二叉树的摘挂列车编组钩计划自动编制方法
引用本文:王雅琳,肖媛,雷友诚,桂卫华.基于排序二叉树的摘挂列车编组钩计划自动编制方法[J].中国铁道科学,2012,33(3):116-122.
作者姓名:王雅琳  肖媛  雷友诚  桂卫华
作者单位:中南大学信息科学与工程学院,湖南长沙,410083
基金项目:教育部新世纪优秀人才支持计划项目(NCET-08-0576);教育部博士点基金资助项目(200805331103);长沙市科技计划项目(K0802079-11)
摘    要:根据摘挂列车编组调车作业原理,将摘挂列车下落问题抽象为排序问题,提出一种基于排序二叉树的编组钩计划自动编制方法.根据待编列车序列构造排序二叉树;利用排序二叉树的有序性快速搜索出有序车组序列,将其作为下落方案的可选集.考虑邻组、暂合列内收编固定组组别和空闲组别、端组等因素,从可选集中筛选出较优的下落方案.通过定义收编固定组简化列车收编过程,实现列车收编过程的计算机自动编制.通过实例验证,采用该方法降低了选择下落方案的复杂性,减少了列车编组钩计划的调车钩数,而且可根据实际调车线数灵活调整方案.

关 键 词:摘挂列车  钩计划  编组计划  调车作业  排序二叉树  下落方案

Automatic Compilation Method for Marshalling Coupler Plan of Trains Detaching and Attaching Based on Binary Search Tree
WANG Yalin , XIAO Yuan , LEI Youcheng , GUI Weihua.Automatic Compilation Method for Marshalling Coupler Plan of Trains Detaching and Attaching Based on Binary Search Tree[J].China Railway Science,2012,33(3):116-122.
Authors:WANG Yalin  XIAO Yuan  LEI Youcheng  GUI Weihua
Institution:(School of Information Science and Engineering,Central South University,Changsha Hunan 410083,China)
Abstract:According to the principle of classification shunting operations of trains,train detaching and attaching fall-down problem is Abstracted as a sequencing problem,and a method for automatically generating marshalling coupler plan is presented based on binary search tree.A binary search tree,which is applied to the sequence of trains waiting to be marshaled,is built.By its feature of orderliness,the sequence arrays are searched quickly and are used as the selectable sets of fall-down plans.Considering such factors as adjacent wagon group,the fixed wagon group of the temporary merging train set in the merging process,idle wagon group and end wagon group,better fall-down plans can be chosen from the selectable sets.A new definition of take-in marshalling fixed group is introduced to simplify the take-in marshalling process by using computer.Examples verify that the proposed method can reduce the complexity of selecting fall-down plan,save the shunting hooks in marshalling coupler plan and flexibly adjust the plan according to the actual number of shunting tracks.
Keywords:Train detaching and attaching  Shunting trip plan  Formation plan  Shunting operation  Binary search tree  Fall-down plan
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号