酉水大桥引桥T梁制、架和主桥悬灌同时施工的工艺研究
引用本文:杨永伟,周勇,谭宁.酉水大桥引桥T梁制、架和主桥悬灌同时施工的工艺研究[J].中南公路工程,2013(5):188-192.
作者姓名:杨永伟  周勇  谭宁
作者单位:[1]中铁二十三局集团公司张花高速第25合同段,湖南保靖416500 [2]湖南省张花高速公路建设开发有限公司,湖南张家界427000
摘    要:以湖南省张花高速酉水河大桥4 ×40 +80+ 145 +80 m预应力混凝土连续T梁和斜高墩大跨径预应力混凝土连续梁桥桥为工程背景,引桥40mT梁和主桥18个悬臂节块同时施工,引桥40mT梁制、架先于主桥完工,根据酉水大桥4#交接墩墩身高度达57 m、直线段长度为6.5m及直线段混凝土方量为106.85 m3等特点,在架设完成的40 m T梁上布置贝雷片吊架作为施工4#交接墩边跨直线段的主要施工设备,直线段施工完成后边跨进行合龙,简述吊架构造,介绍边跨现浇段吊架施工工艺和边跨合龙张拉等关键工序,对同类桥梁加快工程施工进度和节约投资有重要指导意义.

关 键 词:主桥  引桥  同时施工  交接墩  边跨现浇段  吊架  边跨合龙  张拉

Youshui Bridge T Beam, Frame and Main Bridge Cantilever Construction at the Same Time Process Research
YANG Yongwei;ZHOU Yong;TAN Ning.Youshui Bridge T Beam, Frame and Main Bridge Cantilever Construction at the Same Time Process Research[J].Central South Highway Engineering,2013(5):188-192.
Authors:YANG Yongwei;ZHOU Yong;TAN Ning
Institution:YANG Yongwei;ZHOU Yong;TAN Ning(Bureau of China Railway Group twenty-three Zhang Hua high speed twenty-fifth contract section of Baojing, Hunan 416500, China;Hunan Province Zhang Hua highway development limited company, Zhangjiajie, Hunan 427000, China)
Abstract:taking Hunan Province Zhang Hua high-speed Youshui River Bridge 4 × 40 + 80 + 145+ 80 m prestressed concrete continuous T beam and the oblique pier and long-span prestressed concrete continuous beam Qiao Qiao as engineering background,the bridge 40 m T beam and the 18 cantilever segmental construction at the same time,the approach of 40 mT beam,frame before the main bridge is completed,according to the 4# handover Youshui bridge pier the height is 57 m,length is 6.5 m and line segment concrete side volume 106.85 m3 characteristics,main construction equipment layout Bailey bracket used as construction of 4# transfer pier side span straight line segments in 40 m T beam erection on the completion of construction,line segment after cross of closure,the suspension bracket structure,the side span cast-in-place section of pylon construction technology and side span closure tensioning key processes,to the similar bridge to speed up the construction progress and has an important significance in saving investment.
Keywords:the main bridge construction at the same time transfer pier side span hanger side span closure Zhang La